WMSIC Electronic Components

Product RFQ

1000uF 6.3V Red Marking Long Lead Solid Polymer Capacitor 6R3ARCP102M06A0P00 Through Hole D6.3xL10mm

Use the form for single models, category sourcing, and multi-line BOM requirements.

Model6R3ARCP102M06A0P00
PackageThrough-hole, D6.3x L10mm
BrandAPAQ
StockRFQ

Product details

Product name
6.3V 1000UF 红字 长脚
Type
固态Capacitor
Unit
-
Minimum package
500
recent_sales
0

Request for quote

Send RFQ

Incoming package verification Our RFQ workflow is designed for multi-line component lists, substitute checks, package confirmation, and delivery planning.
Model and BOM matching Our RFQ workflow is designed for multi-line component lists, substitute checks, package confirmation, and delivery planning.
Quote, lead time, and logistics plan Our RFQ workflow is designed for multi-line component lists, substitute checks, package confirmation, and delivery planning.

Related products

Packaged components ready for RFQ.