WMSIC Electronic Components

Product RFQ

68pF+/- 10% 6kV High Voltage Ceramic Disc Capacitor Outside Bent Long Leads A09S2D680KN0B2S0N0 Through Hole P 10mm

Use the form for single models, category sourcing, and multi-line BOM requirements.

ModelA09S2D680KN0B2S0N0
PackageThrough-hole, P=10mm
BrandSTE
Stock270

Product details

Product name
68p F ±10% 6k V 外弯 长脚
Type
直插瓷片Capacitor
Unit
-
Minimum package
500
容值
68pF
精度
±10%
Pitch
10mm
额定Voltage
6kV
recent_sales
6

Request for quote

Send RFQ

Incoming package verification Our RFQ workflow is designed for multi-line component lists, substitute checks, package confirmation, and delivery planning.
Model and BOM matching Our RFQ workflow is designed for multi-line component lists, substitute checks, package confirmation, and delivery planning.
Quote, lead time, and logistics plan Our RFQ workflow is designed for multi-line component lists, substitute checks, package confirmation, and delivery planning.

Related products

Packaged components ready for RFQ.