WMSIC Electronic Components

Product RFQ

3.3nF+/- 10% 2kV High Voltage Ceramic Disc Capacitor Straight Long Leads R13B1B332KN0B0S0N0 Through Hole P 5mm

Use the form for single models, category sourcing, and multi-line BOM requirements.

ModelR13B1B332KN0B0S0N0
PackageThrough-hole, P=5mm
BrandSTE
Stock95

Product details

Product name
3.3n F ±10% 2k V 直脚 长脚
Type
直插瓷片Capacitor
Unit
-
Minimum package
500
容值
3.3nF
精度
±10%
Pitch
5mm
额定Voltage
2kV
recent_sales
3

Request for quote

Send RFQ

Incoming package verification Our RFQ workflow is designed for multi-line component lists, substitute checks, package confirmation, and delivery planning.
Model and BOM matching Our RFQ workflow is designed for multi-line component lists, substitute checks, package confirmation, and delivery planning.
Quote, lead time, and logistics plan Our RFQ workflow is designed for multi-line component lists, substitute checks, package confirmation, and delivery planning.

Related products

Packaged components ready for RFQ.