WMSIC Electronic Components

Product RFQ

High Voltage Ceramic Capacitor 10pF 6kV+/- 10% Long Lead A07A1D100KN0B0S0N0 Through Hole P 10mm

Use the form for single models, category sourcing, and multi-line BOM requirements.

ModelA07A1D100KN0B0S0N0
PackageThrough-hole, P=10mm
BrandSTE
StockRFQ

Product details

Product name
10p F ±10% 6k V 长脚
Type
直插瓷片Capacitor
Unit
-
Minimum package
500
容值
10pF
精度
±10%
Pitch
10mm
额定Voltage
6kV
recent_sales
1

Request for quote

Send RFQ

Incoming package verification Our RFQ workflow is designed for multi-line component lists, substitute checks, package confirmation, and delivery planning.
Model and BOM matching Our RFQ workflow is designed for multi-line component lists, substitute checks, package confirmation, and delivery planning.
Quote, lead time, and logistics plan Our RFQ workflow is designed for multi-line component lists, substitute checks, package confirmation, and delivery planning.

Related products

Packaged components ready for RFQ.