WMSIC Electronic Components

Product RFQ

5mm Blue LED Diode Diffused Long Lead 5A4BUD Through Hole D 5mm

Use the form for single models, category sourcing, and multi-line BOM requirements.

Model5A4BUD
PackageThrough-hole, D=5mm
BrandGuiguang light

Technical data

Product details

8 specifications
Product overview 5A4BUD
5A4BUD is cataloged as LEDDiode / LED with the Through-hole, D=5mm package. Key catalog parameters include Current: 20mA, Type: 5mm, and (Vf): 2.8V~3.2V.

Core information

Product name
5mm
Type
LEDDiode / LED
Unit
-
Minimum package
1000

Technical parameters

LED
Electronic Component
Current
20mA
Type
5mm
(Vf)
2.8V~3.2V

Request for quote

Send RFQ

Use the form for single models, category sourcing, and multi-line BOM requirements.

Send your target model and quantity.
Incoming package verification Our RFQ workflow is designed for multi-line component lists, substitute checks, package confirmation, and delivery planning.
Model and BOM matching Our RFQ workflow is designed for multi-line component lists, substitute checks, package confirmation, and delivery planning.
Quote, lead time, and logistics plan Our RFQ workflow is designed for multi-line component lists, substitute checks, package confirmation, and delivery planning.

Buyer sourcing scenarios

Practical notes from common component sourcing work.

Anonymized editorial summaries of recurring BOM review, package confirmation, small-batch sourcing, and export handoff conversations.

The useful part was package confirmation before quote. It saved us a second round of checking with engineering.
M. Tan Singapore
We sent a mixed BOM and received a clear reply with available lines, alternates, and delivery notes.
A. Keller Germany
Small quantities and replenishment orders are easier when photos, package, and courier details are handled in one thread.
R. Patel India
For a repair batch, we needed clear package photos more than a long quote sheet. The reply focused on the exact models we could use.
L. Nguyen Vietnam
The team flagged two lines where our package notes were vague. That was more helpful than simply sending a price table.
J. Miller United States
We had a short list of transistors and connectors. WMSIC kept the response tidy: model, package, quantity, and shipment option.
C. Ito Japan
Export packing details were confirmed before payment, which made our internal approval easier.
N. Okafor Nigeria
The BOM reply separated available items from lines that needed alternate checking. That format was easy to forward to our engineer.
S. Martin France
We needed a Shenzhen-side check for a few replenishment parts. The answer was short: package photo, stock route, and courier note.
K. Wong Hong Kong
The RFQ reply helped us clean up three old part numbers before purchasing. That mattered more than a fast price alone.
S. Lim Malaysia
For maintenance stock, WMSIC confirmed the package and minimum packing details before we sent approval internally.
P. Santos Philippines
We asked for connector and transistor lines in one message. The response kept the package notes clear enough for our technician.
W. Chen Taiwan
A small MOSFET list came back with practical alternates and shipping notes. It was easy to compare with our original BOM.
D. Rossi Italy
The team checked model text and package photos first, which reduced the risk of ordering the wrong version.
H. Kim South Korea
We appreciated the simple format: available lines, items to recheck, and export packing comments.
B. Nowak Poland
Our BOM had mixed old and current codes. WMSIC marked the uncertain lines instead of forcing a quick quote.
T. Yilmaz Turkey
The shipment details were clear enough for customs preparation, especially carton and invoice notes.
F. Oliveira Brazil
We used WMSIC for a trial sourcing list. The package photos and delivery options made approval faster.
M. Hassan United Arab Emirates
The team handled a small batch request without making the process heavy. Model, package, quantity, and courier were covered.
K. Smith Australia
The reply separated confirmed parts from alternates, which helped us make a clean purchasing note for engineering.
P. van Dijk Netherlands

Related products

Packaged components ready for RFQ.