WMSIC Electronic Components

Product RFQ

XL-A504RGBC F5 RGB LED Common Cathode Long Lead XL-A504RGBC Through Hole D 5mm

Use the form for single models, category sourcing, and multi-line BOM requirements.

ModelXL-A504RGBC
PackageThrough-hole, D=5mm
BrandXINGLIGHT

Technical data

Product details

8 specifications

Core information

Product name
F5 LEDDiode
Type
RGB LED
Unit
-
Minimum package
1000

Technical parameters

Electronic Component
B:460nm~470nm;G:515nm~530nm;R:620nm~630nm
LED
G:4000mcd~6000mcd;B:1000mcd~1500mcd;R:700mcd~1800mcd
Electronic Component
G:525nm;R:625nm;B:465nm
Diode
Electronic Component
Product overview XL-A504RGBC
XL-A504RGBC is cataloged as RGB LED with the Through-hole, D=5mm package. Key catalog parameters include LED: G:4000mcd~6000mcd;B:1000mcd~1500mcd;R:700mcd~1800mcd.

Product sourcing intelligence

Model, package, availability, and BOM fit reviewed before quotation.

WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.

Electronic component model and package intelligence review on an ESD-safe inspection bench

Model & package intelligence

Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.

BOM matching and alternative component comparison workstation with protected IC samples

BOM matching & alternatives

BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.

Electronic component sourcing availability dashboard with ESD-protected samples

Sourcing availability signal

Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.

Request for quote

Send RFQ

Use the form for single models, category sourcing, and multi-line BOM requirements.

Send your target model and quantity.

Buyer sourcing scenarios

Practical notes from common component sourcing work.

Anonymized editorial summaries of recurring BOM review, package confirmation, small-batch sourcing, and export handoff conversations.

The useful part was package confirmation before quote. It saved us a second round of checking with engineering.
M. Tan Singapore
We sent a mixed BOM and received a clear reply with available lines, alternates, and delivery notes.
A. Keller Germany
Small quantities and replenishment orders are easier when photos, package, and courier details are handled in one thread.
R. Patel India
For a repair batch, we needed clear package photos more than a long quote sheet. The reply focused on the exact models we could use.
L. Nguyen Vietnam
The team flagged two lines where our package notes were vague. That was more helpful than simply sending a price table.
J. Miller United States
We had a short list of transistors and connectors. WMSIC kept the response tidy: model, package, quantity, and shipment option.
C. Ito Japan
Export packing details were confirmed before payment, which made our internal approval easier.
N. Okafor Nigeria
The BOM reply separated available items from lines that needed alternate checking. That format was easy to forward to our engineer.
S. Martin France
We needed a Shenzhen-side check for a few replenishment parts. The answer was short: package photo, stock route, and courier note.
K. Wong Hong Kong
The RFQ reply helped us clean up three old part numbers before purchasing. That mattered more than a fast price alone.
S. Lim Malaysia
For maintenance stock, WMSIC confirmed the package and minimum packing details before we sent approval internally.
P. Santos Philippines
We asked for connector and transistor lines in one message. The response kept the package notes clear enough for our technician.
W. Chen Taiwan
A small MOSFET list came back with practical alternates and shipping notes. It was easy to compare with our original BOM.
D. Rossi Italy
The team checked model text and package photos first, which reduced the risk of ordering the wrong version.
H. Kim South Korea
We appreciated the simple format: available lines, items to recheck, and export packing comments.
B. Nowak Poland
Our BOM had mixed old and current codes. WMSIC marked the uncertain lines instead of forcing a quick quote.
T. Yilmaz Turkey
The shipment details were clear enough for customs preparation, especially carton and invoice notes.
F. Oliveira Brazil
We used WMSIC for a trial sourcing list. The package photos and delivery options made approval faster.
M. Hassan United Arab Emirates
The team handled a small batch request without making the process heavy. Model, package, quantity, and courier were covered.
K. Smith Australia
The reply separated confirmed parts from alternates, which helped us make a clean purchasing note for engineering.
P. van Dijk Netherlands

Related products

Packaged components ready for RFQ.