Model & package intelligence
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
Available for RFQ
Technical data
For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.
SMCJ30A 为 BORN(伯恩半导体)出品的单向瞬态电压抑制器(TVS),采用 SMC(DO‑214AB)封装,专为保护 24V/30V 级别电源与信号线免受雷击、开关瞬变及静电放电等脉冲过电压而设计。器件体积适中,便于自动贴片或波峰焊工艺安装,适合工业与车用电子等场景。
SMCJ30A 在超过击穿电压(≈33.3 V)时进入雪崩导通状态,将短时间内的高能脉冲电流导入接地,从而将电压钳制在 ~48.4 V(31 A 脉冲条件)附近。低反向泄漏电流(1 µA)保证正常工作时对电源系统影响微小。1.5 kW 的峰值脉冲功率能力表示在指定脉冲能量下具备较强的吸收能力,但长期或超出规格的冲击仍需外加级联保护或限流措施。
SMC(DO‑214AB)为中等功率 TVS 常用封装,散热能力依赖 PCB 铜箔面积与过孔布局。建议在器件底部与焊盘周围增加散热铜箔并在接地侧设置过孔与散热通道;对频繁冲击场合,可增大散热面积或并联多只器件以分散能量。
SMCJ30A(BORN,SMC 封装)为面向 30 V 级系统的高能瞬态抑制元件,具有较低泄漏电流、明确的击穿与钳位特性(33.3 V / 48.4 V @31 A)及良好的脉冲能量承受能力(1.5 kW)。在设计防护电路时,应结合系统脉冲特性、散热条件及机械安装要求进行合理选型与布局,以保证长期可靠运行。
Request for quote
Use the form for single models, category sourcing, and multi-line BOM requirements.
Product sourcing intelligence
WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.
Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.
Buyer sourcing scenarios
Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.
The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.
A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.
The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.
Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.
Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.
When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.
Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.
The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.
Related products