Model & package intelligence
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
Available for RFQ
Technical data
For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.
IS2805-4 是 ISOCOM(英国安数光)推出的一款四通道晶体管输出光耦,适用于交流与直流信号隔离。器件输入侧为发光二极管(正向压降典型值 Vf ≈ 1.2V),最大允许正向电流 If 为 50mA;输出侧为光电三极管,单通道输出电流可达 50mA,最大负载电压可支援至 80V。典型电气参数包括:隔离耐压 3.75kVrms、集射极饱和电压 VCE(sat) = 0.4V(条件:Ic = 8mA,If = 2.4mA)、电流传输比 CTR 范围 20%(最小)至 400%(最大)、上升/下降时间 tr = 3µs、tf = 4µs。器件工作温度范围 -55°C 至 +110°C,总功耗 Pd = 170mW(器件级)。封装为 SOIC-16(175 mil)。
IS2805-4 采用 SOIC-16(175 mil)表面贴装封装,多通道同一封装便于 PCB 布局与批量应用。器件通过高压隔离结构实现 3.75kVrms 的耐压能力,适合工业场景下的功能性隔离。推荐在 PCB 布局时为输入、输出两侧留出充足的爬电与间隙距离,并遵循厂商推荐的焊盘与走线规则以保证长期可靠性。
总结:IS2805-4 在通道密度、耐压与中速开关性能之间取得平衡,适合工业与通用电子隔离场合。设计时关注 CTR 的宽幅变化、功耗限制与输出拉电阻设计,可获得稳定且可靠的隔离信号接口。
Request for quote
Use the form for single models, category sourcing, and multi-line BOM requirements.
Product sourcing intelligence
WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.
Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.
Buyer sourcing scenarios
Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.
The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.
A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.
The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.
Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.
Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.
When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.
Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.
The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.
Related products