WMSIC Electronic Components

LGE BZV55C18

ModelBZV55C18
PackageSOD-80
BrandLGE
Price Price on request Electronic component prices change quickly with market supply and demand. Please refer to the latest WMSIC quotation for current pricing.
Configuration
1 options
Configuration 26+

Available for RFQ

Technical data

Product details

19 specifications

Core information

Product name
LGE BZV55C18
Type
LGE
Minimum package
2500 圆盘

Technical parameters

Electronic Component
Electronic Component
Electronic Component
LGE
Electronic Component
BZV55C18
Electronic Component
1
Package
SOD-80
Electronic Component
Zener Diode
Electronic Component
0.046g
Electronic Component
1
(Zzk)
170Ω
(Zzt)
50Ω
Electronic Component
BM0257672022
Diode
1
Current(Ir)
100nA@13V
Power Dissipation(Pd)
500mW
Electronic Component
16.8V~19.1V
Electronic Component
65℃~+200℃

For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.

BZV55C18 稳压二极管产品概述

一、产品概述

BZV55C18 是鲁光(LGE)出品的一款独立式稳压二极管,标称稳压值为 18V,实际稳压范围为 16.8V~19.1V,适用于作为小功率电压基准与过压钳位元件。器件采用 LL-34 封装(文档中亦标注 SOD-80 形式),体积小、抗振动性能好,适合空间受限与批量贴装的场合。

二、主要电气参数

  • 标称稳压值:18V(范围 16.8V~19.1V)
  • 反向漏电流:100nA @ 13V(极低漏电,有利于高阻抗电路)
  • 耗散功率:Pd = 500mW(注意散热限制)
  • 阻抗:Zzt = 50Ω;Zzk = 170Ω(分别对应测试工作点和拐点附近的动态阻抗)
  • 工作结温范围:-65℃ ~ +200℃
  • 配置:独立式(单个稳压二极管)

三、特点与应用价值

  • 低漏电:100nA@13V 的低反向电流,适合对偏置电流敏感的模拟电路与传感器前端。
  • 低至中等功耗:500mW 的耗散能力适合做本地基准或小电流钳位,便于替代复杂稳压器实现简单的稳压/基准功能。
  • 良好的动态特性:Zzt=50Ω 在工作电流点提供较好的电压稳定性,适合对噪声和电压摆幅有一定要求的场合。
  • 宽温度范围:-65℃~+200℃ 的结温等级说明器件在高温和工业环境下具有较好可靠性。

四、典型应用场景

  • 小功率基准电路、偏置电源和参考电压;
  • 输入浪涌或反向电压的保护/钳位;
  • 仪表、传感器前端、通信终端及电池管理中的简单稳压单元;
  • 工业控制和航空航天等需耐高温环境的电子模块(在满足热管理要求下)。

五、选型与使用要点

  • 最大稳压电流估算:在理想散热条件下 Iz_max ≈ Pd / Vz ≈ 0.5W / 18V ≈ 27.7mA。实际应用中建议留有余量,并考虑环境温度与封装散热,典型工作电流常选 1–10mA 区间。
  • 串联限流电阻计算示例:若 Vin=24V,期望 Iz=10mA,则 R=(24−18)/10mA=600Ω;同时要检验二极管耗散功率与限流电阻的功耗。
  • 温度与功耗管理:高结温能力强,但长期在接近 Pd 条件下工作会缩短寿命,应通过 PCB 散热铜箔、热 vias 或降低工作电流来改善热环境。
  • 漏电与精度:若用于精密基准,应注意在不同电压点与温度下的漏电与阻抗变化对稳压值的影响,必要时配合缓冲放大器或稳压/温补电路使用。

六、包装与订购信息

品牌:LGE(鲁光);封装:LL-34(文中标注 SOD-80 可作贴片替代版本)。在选购时请确认封装与出货形式,并参考厂家完整器件数据手册以获得详细的 I–V 曲线、热阻与封装尺寸信息。

总结:BZV55C18 对于需要 18V 小功率稳压、低漏电和高温适应性的应用,是一种经济且可靠的选择,但使用时需重视功耗计算与散热设计以保证长期稳定运行。

Request for quote

Send RFQ

Use the form for single models, category sourcing, and multi-line BOM requirements.

Send your target model and quantity.

Product sourcing intelligence

Model, package, availability, and BOM fit reviewed before quotation.

WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.

Electronic component model and package intelligence review on an ESD-safe inspection bench

Model & package intelligence

Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.

BOM matching and alternative component comparison workstation with protected IC samples

BOM matching & alternatives

BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.

Electronic component sourcing availability dashboard with ESD-protected samples

Sourcing availability signal

Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.

Buyer sourcing scenarios

Examples of how common component sourcing requests are organized.

Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.

The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.

Package confirmation Typical RFQ workflow

A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.

Mixed BOM triage Typical RFQ workflow

The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.

Obsolete-part review Typical RFQ workflow

Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.

Small-batch request Typical RFQ workflow

Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.

Repair batch evidence Typical RFQ workflow

When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.

Model suffix clarification Typical RFQ workflow

Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.

Export handoff Typical RFQ workflow

The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.

Replenishment inquiry Typical RFQ workflow

Related products

Packaged components ready for RFQ.