Model & package intelligence
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
Available for RFQ
Technical data
For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.
GRM1555C1H331JA01D 是村田(muRata)出品的一款高稳定性多层陶瓷贴片电容(MLCC),额定容量为 330 pF,额定电压 50 V,温度特性为 C0G(NP0),公差 ±5%,封装为 0402(美国惯例称 0402,公制约 1005)。该型号以介质稳定、损耗低、频率特性好著称,适合对电容精度和温度稳定性要求较高的设计场合。
C0G(NP0)介质本质上属于一类线性、近乎零温度系数的材料,随温度变化电容值几乎不变,损耗极低,适合需要高 Q 值和稳定相位、频率响应的应用。与类二陶瓷(如 X7R、X5R)相比,本型号在温漂、老化和直流偏置下的容量变化非常小,提供长期稳定的电气行为。
0402 小尺寸有利于减小寄生量并提高装配密度,但在装配和板面应力上相对敏感。该型号适用于标准回流焊工艺(请按厂商建议的焊接温度曲线操作),建议在 PCB 设计时避免在焊盘附近出现过大的机械应力、控制焊盘尺寸与焊膏量以获得良好焊接应力分布。C0G/NP0 几乎无老化,但仍需考虑热循环与机械应力对长期可靠性的影响。
GRM1555C1H331JA01D 以其 C0G(NP0)介质的高稳定性、低损耗特性和 0402 的小型化封装,适合对频率特性与温度稳定性要求高的精密电子电路。合理的 PCB 布局与焊接工艺、适当的电压裕量和机械防护,将确保该电容在长期工作中的可靠性与性能稳定。若需更详细的电气特性曲线与焊接参数,建议参考村田官方数据手册或向供应商索取样片测试。
Request for quote
Use the form for single models, category sourcing, and multi-line BOM requirements.
Product sourcing intelligence
WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.
Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.
Buyer sourcing scenarios
Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.
The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.
A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.
The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.
Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.
Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.
When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.
Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.
The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.
Related products