Model & package intelligence
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
Available for RFQ
Technical data
For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.
GRM155R60J225ME15D 是一种高性能的多层陶瓷电容器(MLCC),由知名电子元器件制造商村田(muRata)生产。该电容器采用0402封装(即1.00mm x 0.50mm),是一款表面贴装电容,广泛应用于各种电子设备和电路中。它的电容值为2.2µF,额定电压为6.3V,具有±20%的容差,这使其适用于多种工作环境和条件下的电源去耦、滤波和噪声抑制等应用。
电容值与容差:
额定电压:
温度系数:
工作温度:
封装与尺寸:
安装类型:
GRM155R60J225ME15D广泛应用于多种电子元器件中,例如:
高可靠性:
优秀的频率特性和低ESR:
小型化与高集成度:
总之,GRM155R60J225ME15D是一款具有卓越性能、适应广泛温度范围和电压等级的小型陶瓷电容器。在现代电子产品中,它是实现电源管理、信号处理和电力调节的理想选择。凭借其高可靠性和广泛的应用范围,该电容器成为电子工程师设计和开发的信赖选择,满足现代电子行业对于性能和空间的双重要求。无论是在消费电子、工业设备还是汽车电子领域,GRM155R60J225ME15D都展现出其不可或缺的重要性。
Request for quote
Use the form for single models, category sourcing, and multi-line BOM requirements.
Product sourcing intelligence
WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.
Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.
Buyer sourcing scenarios
Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.
The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.
A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.
The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.
Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.
Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.
When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.
Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.
The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.
Related products