Model & package intelligence
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
Available for RFQ
Technical data
For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.
EDZVFHT2R6.8B 为 ROHM(罗姆)推出的小功率齐纳二极管,标称稳压值 6.79V,稳压范围 6.65V~6.93V,公差约 ±2.06%。器件为表面贴装型(封装:SC-79 / SOD-523),适用于对体积和功耗有严格限定的便携与消费类电子产品中作为基准稳压与浪涌保护之用。
器件额定耗散功率仅 150 mW,使用时务必限制通过齐纳的电流以避免功耗超标。理论上在满耗散条件下的电流约为 Pd/Vz ≈ 22 mA(150 mW / 6.79 V),但实际工作应留余量并考虑 PCB 的散热能力与周围元件热耦合。长时间高功率工作会导致稳压点漂移或器件损坏。
在选择时需注意稳压点、额定耗散和封装尺寸是否满足系统需求。对于更高功率或更精密稳压需求,应考虑功率等级更高或容差更小的齐纳/参考源替代方案。
总结:EDZVFHT2R6.8B 以其小体积、低漏电与适中的稳压精度,适合空间受限且功耗要求严格的应用场合,作为低功耗参考或保护元件具有良好性价比。
Request for quote
Use the form for single models, category sourcing, and multi-line BOM requirements.
Product sourcing intelligence
WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.
Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.
Buyer sourcing scenarios
Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.
The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.
A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.
The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.
Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.
Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.
When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.
Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.
The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.
Related products