Model & package intelligence
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
Available for RFQ
Technical data
For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.
Sunlord GZ3216D800TF是一款1206封装的片式铁氧体磁珠,专为100MHz频段电磁干扰(EMI)滤波设计,兼顾低直流损耗与宽温适应性,广泛适配消费电子、工业控制、通信设备等领域的信号/电源线路干扰抑制需求。
典型应用场景包括:
该磁珠的关键参数围绕干扰抑制能力、直流损耗、电流承载能力三个核心维度设计,具体如下:
阻抗为80Ω±25%@100MHz,这是磁珠最核心的EMI滤波参数——在100MHz频段(常见的射频干扰、高速数字电路噪声频段),磁珠呈现较高阻抗,可有效衰减该频段的干扰信号,同时对直流/低频信号(如电源、低速数字信号)的阻碍作用极小。
工作温度为**-55℃~+125℃**,符合工业级电子元器件温度要求,可在极端环境(如寒冷地区户外设备、高温工业车间)中稳定工作,性能无明显衰减。
采用1206英制封装(对应公制3216,尺寸约3.2mm×1.6mm×1.0mm),贴片式设计兼容标准SMT生产线,适合高密度PCB布局,满足小型化电子设备的尺寸要求。
顺络采用自主研发的高性能铁氧体材料(适配100MHz频段),具备以下优势:
Sunlord GZ3216D800TF磁珠的核心优势在于:100MHz频段精准滤波+低直流损耗+宽温可靠性+小体积封装,完美平衡EMI抑制效果与电路效率,是消费电子、工业控制等领域的高性价比EMI滤波解决方案。
Request for quote
Use the form for single models, category sourcing, and multi-line BOM requirements.
Product sourcing intelligence
WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.
Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.
Buyer sourcing scenarios
Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.
The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.
A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.
The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.
Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.
Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.
When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.
Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.
The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.
Related products