WMSIC Electronic Components

SILAN SFR25U20PN

ModelSFR25U20PN
PackageTO-3PN
BrandSILAN
Price Price on request Electronic component prices change quickly with market supply and demand. Please refer to the latest WMSIC quotation for current pricing.
Configuration
1 options
Configuration Date code within 2 years

Available for RFQ

Technical data

Product details

19 specifications

Core information

Product name
SILAN SFR25U20PN
Type
SILAN
Minimum package
600 管

Technical parameters

Electronic Component
Electronic Component
Electronic Component
SILAN
Electronic Component
SFR25U20PN
Electronic Component
1
Package
TO-3PN
Electronic Component
Fast Recovery / High-Efficiency Diode
Electronic Component
7.27g
Electronic Component
1
Electronic Component
BM0231143401
Current
12.5A
Diode
1
Current(Ir)
5uA@200V
(Vf)
980mV@12A
Electronic Component
40℃~+150℃
Electronic Component
Electronic Component
Electronic Component
600

For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.

SFR25U20PN 产品概述

一、产品简介

SFR25U20PN 是士兰微(SILAN)推出的一款快恢复、高效率的功率二极管器件,采用1对共阴极结构并封装于TO-3PN。器件针对开关电源和功率整流场合优化,兼顾低正向压降与较短的反向恢复时间,适合高频开关和大电流整流应用。

二、主要规格

  • 二极管配置:1对共阴极(双二极管,共阴)
  • 正向压降(Vf):0.98 V @ 12 A
  • 额定整流电流:12.5 A(直流整流)
  • 反向耐压(Vr):200 V
  • 反向电流(Ir):5 µA @ 200 V
  • 反向恢复时间(Trr):20 ns
  • 工作结温范围:-40 ℃ ~ +150 ℃
  • 封装:TO-3PN

三、关键性能特点

SFR25U20PN 在12 A 工作点具备低于1 V 的正向压降,能有效降低导通损耗;20 ns 的反向恢复时间属于快恢复等级,可在开关频率较高的电源中减少开关损耗与电磁干扰;低反向漏电流(5 µA @200 V)有利于提高整机待机效率和降低温升。TO-3PN 封装提供良好热性能与机械强度,便于散热处理。

四、典型应用

  • 开关电源(SMPS)输出或整流桥
  • 功率因数校正(PFC)电路中的整流元件
  • 电机驱动的自由轮二极管或再生回路
  • 逆变器、焊机和灯具电子镇流器等高频整流场景
  • 大电流充电/整流模块

五、封装与散热设计要点

TO-3PN 封装有利于将耗散热量直接传导至散热片或机箱,建议在高电流应用中采用良好接触的散热方案。以12 A、Vf≈0.98 V 计算,单颗二极管约承受≈11.8 W 的瞬时功耗,实际热设计应考虑脉冲与占空比、环境温度和回流散热路径。必要时使用绝缘垫圈或复合散热结构,并留出足够铜箔面积以降低结—壳、壳—环境温升。

六、使用与电路注意事项

  • 反向恢复期间产生瞬态电压和电流,需要在高 dI/dt 场合加吸收电路(RC 吸收、RCD 钳位或共模抑制)以抑制过冲与振铃。
  • 并联使用时注意电流分配,避免因正向压降差异造成不均流;必要时采用电阻均流或匹配元件。
  • 高温下应进行电流降额(参考厂方热阻与温度特性曲线),保持结温低于150 ℃。
  • 布局上应尽量缩短开关环路并布局稳定接地,减小寄生电感对恢复过程的影响。
  • 焊接与回流需遵循封装热冲击规范,避免超温或长时间加热损伤器件。

七、可靠性与选型建议

SFR25U20PN 适用于要求中高开关频率且需兼顾效率与热管理的功率场合。选型时请参考士兰微正式 Datasheet 获取详细的热阻、波形测试条件与典型特性曲线,并依据实际工作波形评估开关损耗与热寿命。如需更低正向压降或更紧凑封装,可在同类产品中比较 Vf、Trr 与封装散热能力,以满足系统性能与成本平衡。

以上为 SFR25U20PN 的概述与工程应用建议。如需进一步的参数曲线、热阻数据或参考电路图,可参阅厂商规格书或联系供应商获取样片与测试资料。

Request for quote

Send RFQ

Use the form for single models, category sourcing, and multi-line BOM requirements.

Send your target model and quantity.

Product sourcing intelligence

Model, package, availability, and BOM fit reviewed before quotation.

WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.

Electronic component model and package intelligence review on an ESD-safe inspection bench

Model & package intelligence

Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.

BOM matching and alternative component comparison workstation with protected IC samples

BOM matching & alternatives

BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.

Electronic component sourcing availability dashboard with ESD-protected samples

Sourcing availability signal

Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.

Buyer sourcing scenarios

Examples of how common component sourcing requests are organized.

Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.

The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.

Package confirmation Typical RFQ workflow

A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.

Mixed BOM triage Typical RFQ workflow

The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.

Obsolete-part review Typical RFQ workflow

Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.

Small-batch request Typical RFQ workflow

Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.

Repair batch evidence Typical RFQ workflow

When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.

Model suffix clarification Typical RFQ workflow

Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.

Export handoff Typical RFQ workflow

The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.

Replenishment inquiry Typical RFQ workflow

Related products

Packaged components ready for RFQ.