Model & package intelligence
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
Availability on request
Technical data
For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.
CH9101R是南京沁恒微电子(WCH)推出的USB 2.0转UART串口桥接芯片,核心作用是实现USB接口与UART串口的双向数据转换,解决传统UART设备无法直接连接电脑USB端口的问题。
CH9101R兼顾高速传输、低功耗、宽电压适配,核心参数如下:
参数类别 具体参数 说明 USB协议版本 USB 2.0 Full Speed 兼容USB 1.1设备,符合主流接口规范 UART速率 最高3Mbps 覆盖9600bps~3Mbps宽范围,满足高速传输 工作电压 3.3V/5V(宽电压3.0~5.5V) 兼容嵌入式系统常见电源电压 工作电流 动态15mA(典型值) 低功耗,适合电池设备 静态电流 160uA(典型值) 休眠状态下功耗极低 工作温度 -40℃~+85℃ 工业级温度,适应户外/车载等恶劣环境CH9101R采用小体积封装,常见形式为:
以嵌入式调试接口为例,设计需注意:
CH9101R凭借高速、低功耗、宽电压、工业级温度等特性,成为嵌入式、工业控制、消费电子领域的常用选择。其高集成度与低BOM成本,使其在量产项目中具备强竞争力。对于需要USB-UART双向通信的场景,是一款性价比突出的解决方案。
Request for quote
Use the form for single models, category sourcing, and multi-line BOM requirements.
Product sourcing intelligence
WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.
Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.
Buyer sourcing scenarios
Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.
The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.
A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.
The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.
Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.
Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.
When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.
Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.
The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.
Related products