Model & package intelligence
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
Available for RFQ
Technical data
For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.
MUR420 为独立式快恢复整流二极管,品牌:YANGJIE(扬杰),封装为 DO-27,专为开关电源与高频整流场合设计。主要电气特性如下:
MUR420 的 200V 反向耐压和 4A 连续整流能力,使其适用于多数中低功率开关电源、适配器与整流场合。890 mV 的典型正向压降在 4A 工作点下能显著降低导通损耗;25 ns 的反向恢复时间保证在高开关频率下仍能维持较低的开关损耗与电磁干扰(相较于普通慢恢复二极管,开关损耗和反激尖峰更小)。
器件允许的结温范围宽(-55 ℃ ~ +150 ℃),适应工业级温度要求。实际使用中应关注结-壳与结-环境热阻,4A 连续工作时需设计良好的散热路径。非重复峰值浪涌 125A 可承受开机/故障瞬态,但不宜作为长期过载使用。长期可靠性依赖于正确的散热、避免频繁的大电流浪涌和受潮保存。
封装:DO-27(轴向引线,适合通孔插件或波峰/手工焊接组装);
典型型号标识:YANGJIE MUR420 DO-27。购买时建议向供应商确认批次、出厂测试数据(Vf 测试点、Trr 曲线、IR 测试值)以及是否符合所需的品质与环境标准(如需 RoHS/无铅认证应提前确认)。
总结:MUR420 以其低正向压降、快恢复时间与 200V 耐压在中低功率、高频整流与续流场景中表现均衡,是替代慢恢复二极管以提升效率和减小开关损耗的实用选择。
Request for quote
Use the form for single models, category sourcing, and multi-line BOM requirements.
Product sourcing intelligence
WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.
Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.
Buyer sourcing scenarios
Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.
The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.
A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.
The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.
Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.
Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.
When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.
Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.
The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.
Related products