Model & package intelligence
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
Available for RFQ
Technical data
For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.
HL 50N04是富海微(HL)推出的单只N沟道增强型MOSFET,型号命名中“50”对应标称最大漏极电流能力,“04”对应漏源耐压40V,精准匹配低压大电流应用需求。产品采用TO-252封装(即DPAK封装),为3引脚表面贴装结构,体积紧凑(典型尺寸6.5mm×5.0mm),便于集成到小型化电路中。其工作温度范围覆盖**-55℃至+150℃**,可满足工业级、汽车电子等高低温环境下的长期稳定运行。
HL 50N04的参数针对低压场景做了针对性优化,关键指标及应用意义如下:
TO-252封装是HL 50N04的核心物理优势,具体特性:
HL 50N04的参数特性使其成为以下场景的优选器件:
为保证器件稳定运行,需注意以下要点:
综上,HL 50N04是一款性价比突出的低压大电流MOSFET,兼顾性能与成本,广泛适用于工业、消费电子、汽车电子等领域的低压功率电路设计。
Request for quote
Use the form for single models, category sourcing, and multi-line BOM requirements.
Product sourcing intelligence
WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.
Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.
Buyer sourcing scenarios
Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.
The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.
A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.
The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.
Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.
Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.
When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.
Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.
The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.
Related products