Model & package intelligence
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
Available for RFQ
Technical data
For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.
SMAJ5.0A 为 RUILON(瑞隆源)推出的一款单向瞬态电压抑制二极管(TVS),封装为 DO-214AC(SMA)。该器件专为瞬态过电压保护设计,能在雷击、静电放电或电磁脉冲等干扰事件中快速夹断电压,保护敏感电子电路免受损害。工作温度范围宽(-55℃ 至 +150℃),适合苛刻环境下长期使用。
SMA(DO-214AC)封装适用于手工焊接与回流贴装工艺,适配常见 SMA 封装焊盘尺寸。单向 TVS 安装时,通常将器件的阴极端(标记端)接被保护线路,阳极接地(或系统参考地),以保证在正向浪涌时能够快速钳位并将能量引入地线。布板时建议靠近被保护器件或接入点放置,缩短走线寄生感抗,改善抑制效果。
SMAJ5.0A 对 IEC 61000-4-2(静电放电)和 IEC 61000-4-4(快速瞬变/脉冲群)等电磁兼容项目具有良好防护性能。器件在额定工作温度范围内具有稳定的电气参数和重复浪涌承受能力,但在长期重复高能量冲击下仍建议参考厂方浪涌寿命与热管理建议。
总结:SMAJ5.0A 为一款面向 5 V 级电源和信号线的高能量单向 TVS,具有较高的瞬态吸收能力与工业级温度适应性,适合需要抗静电与浪涌保护的各类电子设备。若需更多参数曲线(如 I-V 特性、功率耗散曲线、典型钳位随脉冲电流变化等),建议参考 RUILON 官方数据手册或联系供应商获取完整规格表。
Request for quote
Use the form for single models, category sourcing, and multi-line BOM requirements.
Product sourcing intelligence
WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.
Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.
Buyer sourcing scenarios
Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.
The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.
A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.
The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.
Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.
Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.
When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.
Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.
The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.
Related products