Model & package intelligence
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
Available for RFQ
Technical data
For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.
78M05 是友台半导体(UMW)推出的一款固定输出线性稳压器(LDO),为单通道正极输出设计,输出电压固定为 5V,最大输出电流可达 1A。该器件适用于对噪声、纹波抑制和可靠性有较高要求的电源后端稳压场合,可作为开关电源的后级滤波/稳压或直接为数字/模数电路供电。
78M05 在 120Hz 下具有高达 80dB 的 PSRR,适合抑制来自整流滤波或开关电源低频纹波;40µV 的典型噪声保证了对模拟信号链和 ADC 前端的电源清洁度。静态电流 6mA 在多通道或电池供电场合有一定耗电考虑,但相比高性能 LDO 已属合理范围。给出 2V@500mA 的压差值,设计时需保证输入电压足以覆盖该压差及负载和瞬态裕量。
TO-252(DPAK)封装便于表面贴装并拥有良好的散热路径。实际 PCB 设计中建议在焊盘下及引脚处配置较大铜箔散热面和热 vias,以提升功耗承载能力。在连续 1A 输出且压降较大时,器件会产生显著热量,需评估热阻并采用合适的散热设计以避免进入热关断保护。
型号:78M05(UMW/友台半导体)
封装:TO-252(DPAK)
在选型与采购时,请以厂商最新规格书为准,确认温度范围、最大功耗与封装管脚定义,并参考厂商推荐的 PCB 布局与旁路电容方案以确保长期可靠运行。
Request for quote
Use the form for single models, category sourcing, and multi-line BOM requirements.
Product sourcing intelligence
WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.
Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.
Buyer sourcing scenarios
Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.
The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.
A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.
The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.
Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.
Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.
When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.
Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.
The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.
Related products