Model & package intelligence
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
Available for RFQ
Technical data
For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.
X252016MOB4SI 是 YXC(扬兴科技)推出的一款无源贴片晶振,中心频率为 16.000MHz,采用 SMD2520-4P 封装,面向要求稳定参考时钟的微控制器、通信设备和消费电子产品。器件为无源晶体谐振器,需要配合 MCU 或专用振荡器输入端的反相器/放大器形成振荡回路。
SMD2520-4P 为四端贴片封装,焊盘周围建议保持良好接地平面以降低杂散电容与干扰。焊接时请参考厂商提供的回流焊工艺曲线,避免因过高温度或不当回流速率影响性能。器件应贴近振荡器输入引脚放置,走线最短且对称,以提高启动性能和频率稳定性。
作为无源晶振,需与 MCU 或振荡器输入端构成反馈回路。外部负载电容 C1、C2 的选取按公式 CL = (C1·C2)/(C1+C2) + Cstray 计算;若取 C1 = C2,则近似 C ≈ 2·(CL - Cstray)。以标称 CL = 12pF、PCB 与引脚寄生电容约 2–4pF 为例,建议起始外部电容值约 14–18pF,实际值可通过频率校准调整。布板时应保证地线完整、走线短并避免强干扰源邻近。
器件为工业级温度范围,适合要求长期稳定性的产品。选型与量产前建议向供应商索取完整的规格书与可靠性测试报告(温度循环、振动、回流焊合格性等),并进行批量样品测试。焊接与清洗工艺、PCB 板层栈结构均会影响寄生电容与最终频率,设计时预留调试空间以确保成品频率符合系统要求。
Request for quote
Use the form for single models, category sourcing, and multi-line BOM requirements.
Product sourcing intelligence
WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.
Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.
Buyer sourcing scenarios
Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.
The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.
A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.
The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.
Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.
Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.
When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.
Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.
The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.
Related products