Model & package intelligence
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
Available for RFQ
Technical data
For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.
BLUE ROCKET 出品的 BC817 为小功率 NPN 晶体管,适合开关与小信号放大应用。器件关键指标为集电极电流 Ic 最大 500 mA、集电极-射极击穿电压 Vceo = 45 V、直流电流增益 hFE 极高(600 @ 100 mA, VCE=1.0 V),特征频率 fT ≈ 100 MHz,封装为 SOT-23,单件供应。器件的集电极截止电流 Icbo 约 100 nA,基射极击穿 Vebo = 5 V,集电极饱和电压 VCE(sat) 在 50 mA 和 500 mA 条件下约 700 mV。
SOT-23 封装下器件标称耗散功率为 250 mW。若在饱和导通时以 Ic = 500 mA、VCE(sat) ≈ 0.7 V 计算,瞬时耗散约 0.35 W(350 mW),已超过封装额定 Pd。结论:不建议在无额外散热或较高 PCB 铜箔散热下持续以 500 mA 工作;500 mA 应作为短脉冲或受控占空比条件下使用。设计时务必计算热阻并预留足够散热面积,或降低平均电流。
封装为 SOT-23,体积小,适合表贴自动化装配。SOT-23 的热阻较大,PCB 设计时应:
若需更高持续电流或更低 VCE(sat),建议选用功率封装(如 SOT-223、TO-220)或使用小功率 MOSFET。BC817(SOT-23 版本)适合体积受限但对瞬态性能与高 hFE 有需求的场合,设计时务必把热耗、驱动电流和器件极限放在首位,以确保可靠工作。
Request for quote
Use the form for single models, category sourcing, and multi-line BOM requirements.
Product sourcing intelligence
WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.
Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.
Buyer sourcing scenarios
Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.
The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.
A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.
The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.
Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.
Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.
When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.
Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.
The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.
Related products