Model & package intelligence
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
Available for RFQ
Technical data
For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.
IRFR5305TRLPBF 为 55 V 等级的 P 沟道 MOSFET,适用于需要高侧开关或反向控制的场合。其导通电阻在 |Vgs|=10 V 条件下为 65 mΩ,表明在充分驱动下导通损耗较低,可胜任中大电流的开关或开关-导通混合工作状态。栅极电荷 Qg=63 nC 表明器件在开关时需较大的驱动能量,开关速度受限于驱动能力与栅极驱动电路设计;输入电容 Ciss=1.2 nF、Crss=250 pF 为设计驱动电路和评估开关损耗的重要参数。
连续漏极电流 31 A 为器件在良好散热条件下的额定能力,但实际应用中应根据 PCB 热阻、焊盘面积与环境温度重新评估器件结温(Tj)与允许电流。Pd=110 W 为器件在特定条件下的额定耗散,实际应参考完整数据手册并结合热阻参数计算。
DPAK (TO-252AA) 为常见的功率 SMD 封装,便于自动贴装与回流焊工艺。该封装通过底部及焊盘向 PCB 传热,热阻受焊盘面积、过孔(vias)数量与散热铜箔面积影响显著。为充分发挥 Pd 与 Id 能力,建议:
总结:IRFR5305TRLPBF 在 55 V 电压等级下提供了中等导通阻抗与较高电流能力,适合高侧开关与各种功率管理应用。设计时需关注栅极驱动能量与散热布局,以在目标工作点实现最佳效率与可靠性。若需进一步的电气特性曲线、热阻值与封装尺寸图,请参考原厂完整数据手册。
Request for quote
Use the form for single models, category sourcing, and multi-line BOM requirements.
Product sourcing intelligence
WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.
Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.
Buyer sourcing scenarios
Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.
The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.
A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.
The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.
Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.
Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.
When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.
Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.
The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.
Related products