Model & package intelligence
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
Available for RFQ
Technical data
For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.
ERJP06J103V是松下(PANASONIC)推出的厚膜贴片电阻,采用行业通用的0805封装(英制尺寸,对应公制2012规格:长2.0mm×宽1.2mm),属于小型化贴片电阻范畴,适配高密度PCB布局需求。作为厚膜电阻,其通过丝网印刷电阻浆料并高温烧结成型,兼顾了成本控制与基本电性能稳定性,适合中低精度要求的常规电路应用。
该电阻的核心电性能参数明确,可覆盖多数通用电路设计场景:
ERJP06J103V的工作温度范围为**-55℃~+155℃**,覆盖工业级环境的温度波动区间(如户外设备、车载辅助系统),同时具备一定的耐温老化能力,可在长期高温环境下保持电性能稳定。此外,厚膜电阻的工艺特性使其对湿度、轻度机械应力有较好耐受性,适合复杂工况应用。
基于电性能与封装特点,该电阻广泛应用于以下领域:
该产品凭借平衡的性能与成本,成为通用电路设计中高性价比的厚膜贴片电阻选择。
Request for quote
Use the form for single models, category sourcing, and multi-line BOM requirements.
Product sourcing intelligence
WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.
Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.
Buyer sourcing scenarios
Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.
The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.
A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.
The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.
Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.
Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.
When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.
Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.
The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.
Related products