Model & package intelligence
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
Available for RFQ
Technical data
For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.
MGJ2D121505SC是YLPTEC(易川)推出的一款双路输出隔离DC-DC电源模块,专为需要正负电压隔离供电的工业、通信等场景设计,具备宽输入范围、高转换效率、强隔离能力等核心特点,且通过相关校验,可靠性有保障。
该模块的核心功能是将12V级输入电压转换为**-5V/40mA和15V/80mA**双路独立隔离输出,同时提供3kVrms的交流隔离保护,有效阻断输入输出端的电气干扰,保障后级电路稳定运行。
其典型应用场景包括:
MGJ2D121505SC采用SIP-5封装(单列直插式5引脚),尺寸为19.5mm(长)×9.8mm(宽)×12.5mm(高),体积小巧紧凑,适合空间受限的PCB板集成。
SIP封装的优势在于:
模块工作温度覆盖**-40℃~+105℃**,可适应户外低温、工业炉窑附近高温等极端环境,无需额外温控措施,提升系统环境适应性。
输出端内置短路保护电路,当某一路输出发生短路时,模块自动切断该路输出(或进入限流状态),防止模块过热损坏,同时避免故障扩散到输入电源或其他电路,提高系统可靠性。
由YLPTEC(易川)生产,且通过相关校验,符合工业级电源模块的基本质量要求,可长期稳定工作。
为确保模块稳定工作,需注意以下要点:
综上,MGJ2D121505SC是一款高性价比的双路隔离DC-DC模块,适用于对体积、隔离、宽温有要求的工业及通信场景,能有效简化电源设计,提升系统稳定性。
Request for quote
Use the form for single models, category sourcing, and multi-line BOM requirements.
Product sourcing intelligence
WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.
Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.
Buyer sourcing scenarios
Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.
The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.
A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.
The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.
Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.
Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.
When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.
Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.
The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.
Related products