Model & package intelligence
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
Available for RFQ
Technical data
For datasheets, package documents, compatible-part guidance, or other technical resources, contact WMSIC customer service. Availability is confirmed case by case.
SMBJ6.0CA 是扬杰(YANGJIE)出品的一款双向瞬态抑制二极管(TVS),用于抑制脉冲过压与浪涌。主要参数:极性:双向;反向截止电压(Vrwm):6V;击穿电压:7.37V;钳位电压:10.3V;反向漏电流(Ir):800µA;峰值脉冲电流(Ipp):58.3A(10/1000µs);峰值脉冲功率(Ppp):600W(10/1000µs)。该器件针对典型的中小功率浪涌事件提供快速响应和高能量吸收能力。
器件采用 SMB(DO-214AA)封装,体积适中,便于通过回流焊装配于印制板。SMB封装具备良好的散热路径及机械强度,适合通用工业与消费类电子的表面贴装工艺。双向结构在正反极性脉冲时均能进行钳位保护,无需外加反向并联器件。
优点:响应速度快、单件能量吸收高(600W@10/1000µs),双向保护简化电路;SMB封装适合批量生产与可靠焊接。
注意事项:10.3V的钳位电压在保护非常敏感的低压IC时可能偏高,应核算被保护器件能承受的最大瞬态电压;反向漏电800µA在低功耗或精密测量场合需评估其影响。
选择SMBJ6.0CA时,确认系统正常工作电压低于Vrwm(6V),并评估钳位电压是否在被保护器件容忍范围内。对于需要在有限空间内实现可靠浪涌防护、且能接受中等漏电流的应用,SMBJ6.0CA 是性价比较高的方案。设计时结合PCB布局、散热与限流策略,可获得稳定的抑制效果与长期可靠性。
Request for quote
Use the form for single models, category sourcing, and multi-line BOM requirements.
Product sourcing intelligence
WMSIC turns product data, package visuals, BOM context, and sourcing signals into practical RFQ notes for buyers.
Model text, package form, tray or reel details, and visual evidence are reviewed together before RFQ feedback.
BOM lines are compared by package, parameters, quantity, and workable alternatives for cleaner sourcing decisions.
Stock routes, quotation confidence, lead-time notes, and shipment feasibility are checked before sales follow-up.
Buyer sourcing scenarios
Typical RFQ scenarios based on the WMSIC form fields, catalog data, manual review steps, and shipment preparation workflow.
The buyer shares the full part number, package requirement, quantity, destination, and available product photos so the quotation can record the exact version under review.
A multi-line BOM is organized into direct sourcing lines, lines that need package clarification, and lines where alternative-part review is permitted.
The original manufacturer part number, datasheet revision, application, critical limits, and acceptable changes are collected before possible candidates are discussed.
Sample quantity, minimum packing, package format, target date, and courier destination are kept together in one RFQ conversation.
Package photos, model markings, board context, and the quantity needed for repair help focus the sourcing review on the relevant version.
When a suffix or package note is incomplete, the response records the open difference and requests buyer confirmation before procurement proceeds.
Packing format, carton notes, invoice details, courier option, destination, and tracking handoff are coordinated around the confirmed order.
The request connects the previously used model, current demand, package evidence, target timing, and replenishment sourcing route.
Related products